Location – London
Value – 70k
Duration – 8 weeks
These work were to welcome staff back post COVID-19 to the City and St.Pauls.
We took two existing tea points and removed them to install one contemporary space. In the other we took away the wall shrouding the existing tea point to install another more open and inclusive area that staff could socialise in and enjoy beverages.
In other areas the existing dark wood panelling was refreshed with an over boarding of plasterboard and the plastering and decor is now a light and airy space that is pleasant to relax in. The removal of old storage has been capitalized to create a more open space and a lighter feel throughout.
This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.
If you disable this cookie, we will not be able to save your preferences. This means that every time you visit this website you will need to enable or disable cookies again.